Erzincan Airport
Climate- Friendly Airport Completed in 15 Months
  • Erzincan
  • 66.525 m²
The construction of Erzincan Airport, which started in 2009, was completed in a short period of 15 months.
The project, which was designed and implemented in harmony with the climatic conditions of the region, meets the transportation needs and strategic needs of the region, and also constitutes a big step for the economic development of the region.

Erzincan Airport, the first airport project of the region after the earthquake, is equipped with a terminal of 33.000 m², apron of 50,000 m² and a parking area of 16.525 m² for 305 vehicles. All electrical and electronic works have been completed and the airport has a flexible design that can reach 3 million passengers. By adding additional terminals, the passenger capacity can be increased up to 10 million. Showing an environmentally friendly approach, Sera Group used 3,500 tons of steel, 3 thousand tons of iron and 40 thousand cubic meters of concrete as well as recycled materials for interior building panels in this project.
DHMİ
Employer
  • Airport
    Sector
  • 2009 - 2010
    Year
  • Erzincan
    Location
  • 66.525 m²